London adds five Electric Double Decker buses

London smog

Not content with the Boris Bike, London continues to experiment with clean transportation and now has five Electric Double Decker Busses in operation.
 
London Electric bus
Transport for London (TfL) has been experimenting with several kinds of battery-electric and fuel cell buses since 2013.
Now it has introduced an electric version of the capital’s iconic double-decker bus into revenue service. TfL is putting five BYD electric double decker buses into service on Route 98 in central London. That’s Pound Land to Willesden via Oxford St.
The 81-passenger buses were designed by BYD to TfL’s specifications. They are equipped with BYD’s Iron-Phosphate Battery packs, which deliver 345 kWh of power. The batteries can power the bus for 24 hours and up to 190 miles of typical urban driving with a four-hour daily recharging session.
BYD will install fast charging equipment at the Willesden Bus Garage in north London, and will provide driver training.

“TfL challenged us to develop a clean, all-electric bus that would meet their service requirements, and we’ve done just that,” said BYD Europe spokesperson Isbrand Ho. “I hope other transport agencies take note of TfL’s leadership and see that there are no barriers to deploying all-electric buses into service in today’s market.”
“The running costs are much lower and some of the maintenance and operations costs are much lower on the buses,” said London’s Deputy Mayor of Environment and Energy Matthew Pencharz. “Also, they are zero-emission, zero-tailpipe-pollution and that is a huge benefit for Londoners.”

BYD a Chinese manufacturer of automobiles and rechargeable batteries with its corporate headquarters in Shenzhen. It also has one of the slowest loading websites in the world. Give it time to load a bunch of his res images.
A fascinating company involved in many aspects of Electric Transportation.

Share:

More Posts

Orsted wind

Ørsted pullS plug on the Hornsea 4 Wind project

Orsted cancel plans to build a huge wind farm in the North Sea Ørsted pulled the plug on the Hornsea 4 project off the east of England on Wednesday as it blamed rising costs and interest rates. The scheme would have seen 180 giant turbines built off the Yorkshire coast providing 2.4 gigawatts (GW) of

april 2025

April Solar production

Over 500 kWh Produced in April 2025 – Sun most day. Shock. What = April 2025 was warm, sunny and ar times nearly hot. In huge contract to gloomy Feb and March, April stands out as spectualy sunny.  The graphs show 2024 gave 325 kWh and 2023 375 kWh. So 500 is a significant jump.

iphone 16

Latest iPhone Success Is A First For Apple

Apple takes #1 spot in Q1 2025 for Smart Phone Sales Research for Counterpoint shows that the global smartphone market grew by 3% in the first quarter of 2025, driven by growth in emerging markets and “a subsidy-led demand boost in China,” it said.  The research went on to mention the thing that has never

Macan EV Turbo front

Review: 2025 Porsche Macan EV Turbo – Electric PowerED SUV Meets Porsche DNA

Macan Turbo EV The wait is over. Porsche has finally pulled the wraps off the all-electric Macan EV Turbo, and after spending some time behind the wheel, it’s clear: this isn’t just a Macan with a battery. It’s the future of Porsche’s compact SUV — and it’s everything we hoped for. First Impressions Let’s get

Send Us A Message